How many yards of concrete do I need for a 10×10 slab?

10 x 10 = 100 square feet. 4 ÷ 12 =.33. 100 x.33 = 33 cubic feet. 33 x.037 = 1.22 cubic yards.

How many 80 pound bags of concrete does it take to make a yard?

how many 80lb bags of concrete are in a yard? You will need 45 bags of concrete mix to make a cubic yard of concrete. There’s 27 cubic feet of concrete in a cubic yard.

How many square feet does a cubic yard of concrete cover?

One Cubic Yard of Concrete: 4-inches thick – covers 81 square feet.

How much does it cost to pour a 12×12 concrete slab?

How much does a 12×12 concrete slab cost? The average cost to pour a 12×12 concrete slab that is 4” thick is between $888 and $1,584, with professional labor and materials included.

You might be interested:  Readers ask: How Many Cubic Feet Is 80 Lb Concrete Bag?

Do you need rebar for 4 inch slab?

No, you do not need rebar for a 4inch slab of concrete on grade. A 4inch-thick slab cast on the ground and in permanent contact with it will float and rebar is not required. Rebar is recommended on concrete measuring 5 – 6 inches thick.

How many bags of concrete makes a yard?

On average, it will take 90 40lb bags, 60 60lb bags, or 45 80lb bags to fill one cubic yard of concrete.

How many bags of concrete do I need for a 10×20 slab?

A 60-pound bag yields. 017 cubic yards, and an 80-pound bag yields. 022 cubic yards. For a 10 x 10 slab, you would need 77 60-pound bags or 60 80-pound bags.

How many bags of concrete do I need for a post hole?

Mix two 50lb bags of concrete with water in a mixing tub or 5-gallon bucket. Add concrete into the hole and around the 4” x 4”. Depending on your climate, let concrete set up for 24 – 48 hours.

Is it cheaper to mix your own concrete?

One of the least expensive ways to get concrete is to mix your own. You can buy bags of the mix from a home improvement store. Typically, you only have to add water for it to be ready to pour. Otherwise, you risk getting a weaker concrete once it cures, which could lead to cracks or crumbles within a couple of years.

How much is 4 yards of concrete cost?

Each cubic yard of concrete costs $119 to $147 per cubic yard delivered.

You might be interested:  Readers ask: How To Lay Laminate Flooring Over Concrete?

Short-Load Concrete Prices.

Cubic Yards Mixing On-site Fees
4 – 4.75 $80
3 – 3.75 $90
2 – 2.75 $100
1 – 1.75 $110

How many bags of quikrete make a yard?

One 80lbs bag of Quikrete Concrete Mix will yield approximately. 60 cu ft. So it will take 45 bag to equal one cubic yard of concrete. If you have a project over a 1/2 a cubic yard you should consider our Mix On-site Concrete especially if you are hand mixing.

How many bags of cement do I need for 100 square feet?

Ans.:- 7.6 no of cement bags (381.30 kgs) are required for 100 sq ft rcc roof slab 4 inch thick m20 grade concrete. Ans.:- 7.6 bags (381.30 kgs), 9.5 bags (476.10 kgs) & 11.4 bags ( 570.8 kgs) cement are required for 100 sq ft rcc roof slab 4 inch, 5inch & 6 inch thick respectively in m20 grade of concrete.

How much does a 20×20 concrete patio cost?

Cost to Install Concrete Patio by Size

Size in Feet Square Footage Price Range
12×14 168 $1,400 – $4,000
15×15 225 $1,800 – $5,500
16×18 288 $2,300 – $7,200
20×20 400 $3,000 – $10,000

What is the difference between a concrete slab and a cement slab?

What is the difference between cement and concrete? Although the terms cement and concrete often are used interchangeably, cement is actually an ingredient of concrete. Concrete is a mixture of aggregates and paste. The aggregates are sand and gravel or crushed stone; the paste is water and portland cement.

Is it cheaper to do pavers or concrete?

As far as installation costs and concrete costs go, poured concrete is technically the most affordable per square foot. However, even though the upfront cost of pavers is higher, concrete pavers offer greater value and durability than poured concrete and stamped concrete.